PIP RFTM1000

Monolithic Refractory Installation Qualification, Inspection, and Testing [Editorial Revision]

Process Industry Practices / 01-Mar-2013 / 17 pages

This Practice provides requirements for quality control and quality assurance for the installation of monolithic refractory lining materials.

This Practice covers the general requirements for testing and inspecting of monolithic refractory linings. Test and inspection methods include installer prequalification, production sample testing, in-progress installation inspection, and final inspection of the completed lining.

Ordering and availability

This publication is available both in printed and PDF edition.

Leave a Reply

Your email address will not be published. Required fields are marked *